Loading...

Türi-Viljandi railway bridges on 27, 29 and 53 km

Türi-Viljandi railway bridges on 27, 29 and 53 km

Share

What we did

We fulfilled bridge deck waterproofing and metal elements cleaning and painting works.

What we used

Bridge deck was waterproofed using GRACE Servidek liquid membrane on which GRACE Servipak 12 mm protection boards were installed. PVC joint profile GRACE Serviseal Type B and slide layer GRACE Slipstrip were used when sealing bridge joints. Inclination levelling was carried out prior to waterproofing works using FEB Febond SBR subtle blend with polymer additive and inclination poles inner surfaces were levelled using BETOSAN Densocrete PPE TH mixture with additive.