Jõe 4A elevator shaft
In the building elevator shaft there was was installed a metal caisson, enveloped by the concrete structure. Water permeated through the leakages between the concrete and the caisson and over the caisson edge to the shaft. As the metal caisson hid the leakage, it was necessary to fill completely the interspace between the metal caisson and the concrete by injection method.
Similar objects
Seedri St. 4
The task was to stop water leaks from basement floor walls and floor construction joints in a boarding house built in 2007. MC-Bauchemie two-compound injection materials system was used to stop the leaks. First we sealed pressurized leaks with polyurethane…
Aseri Brickworks air ducts
Aseri Brickworks in Ida-Virumaa is the biggest in Estonia brick-making plant. In 2008 the production stopped for the economic reasons, but in the year of 2009, when the situation improved, the bricks production was launched again. The plant manufactures bricks,…
ABB Industrial Building
A leading international enterprise in the power and automation area, that provides services to the infrastructure and industrial enterprises. The construction of Jüri plant was started in 2005. The year later it fast increased and the production concentrated on the…