Loading...

Water treatment plant in Kilingi-Nõmme

Preparation works included pressure washing the floor and walls surfaces and acid washing the ceiling. The walls and the floor were cobered with drinking water certificated waterproofing and reinforced concrete protection layer FEB Brushcrete. Ceiling surface was covered with drinking water certificated reinforced concrete protection layer Xypex Modified. Pipe penetrations were sealed.

Share

What we did

We carried out waterproofing works for two reservoirs in a water treatment plant in Kilingi-Nõmme.

What we used

FEB Brushcrete
XYPEX Modified