North Estonian Regional Hospital’s C-corps
GRACE Preprufe 300R was installed under cable and techno tunnel for waterproofing. GRACE Bituthene 4000 rolled-on membrane was used to waterproof well’s walls and ceiling, supporting wall and techno tunnel walls and ceiling. The edges of the rolled-on membrane were sealed using GRACE Bituthene LM and GRACE Bituthene Mastic liquid membranes. Inner corners were filleted using GRACE Bituthene LM liquid membrane before laying out the rolled-on membrane. To protect the waterproofing Iso-Drain 8 Diagonal drainage mats were installed. Exposed deformation joints on supporting walls were filled with MC Mycoflex 488 MS.
Similar objects
Kristiine shopping centre extension
Kristiine shopping centre is a trade centre complex which is the biggest in Estonia according to the number of renters. There are 170 shops and service offices in 53 000 sq.m bruto area that was opened in th 28th of May…
Zincpot in Paldiskis
Zincpot trademark under AS Paldiski Tsingipada is an Estonian company from 2006. The company was created due to the lack of opportunities to quality and modern hot-dip galvanizing in the region. Zincpot services are directed to both inner and outer…
Muuga Harbour Coal Terminal frieght cars dumping hub
In the western part of Muuga Harbour there is a coal terminal, stretching over 44 hectares. Muuga coal terminal storage area is known to be able to store 350 000 tons at a time. Muuga harbour coal terminal consists of…