Loading...

Muuga Port piers 9a and 10a repair works

Damaged areas were opened mechanically and cleaned using sandblasting method. Exposed and cleaned armature was covered with MC Colusal MK polymer-mineral corrosion protection coating. A polymeric repair mixture MC Nafufill GTS was installed using dry torcrete method to restore the concrete cover. Repaired surfaces were covered with mineral and mechanically strong protection cover MC-RIM F.

Share

What we did

We carried out concrete repair works on the bottom of the pier. We installed a protection cover that is suitable for marine conditions.

What we used

MC Zentrifix KMH
MC Nafufill GTS
MC-RIM F